04 May What to Expect During Your Invisible Grille Installation
Posted at 10:57h
in Uncategorized
The 3-Step Process
-
On-Site Measurement: A specialist visits to measure your window or balcony dimensions and check the wall type (concrete vs. false ceiling) to ensure a secure mount.
-
Custom Fabrication: The frame and cables are prepared according to your specific gap requirements (usually 2 to 4 inches).
-
The Installation: On the day, the team installs the top and bottom tracks and tensions each cable manually. A standard balcony usually takes only 2 to 4 hours to complete.
Pro-Tip: Because there is minimal drilling compared to traditional bulky grilles, the dust is kept to a minimum, and your existing window frames remain untouched.